Coalburn 1 BESS
Coalburn 1 is a 500 MW, two-hour lithium-ion battery energy storage system in South Lanarkshire, southern Scotland, with around 1 GWh of storage capacity. It is built on the site of a former coal mining community and, on entering commercial operation in August 2026, became the largest operational battery storage system in Europe. It connects directly to the transmission network, where it can absorb surplus Scottish renewable generation and release it when demand is high.
The project was developed by Copenhagen Infrastructure Partners (CIP), through its Copenhagen Infrastructure IV fund, in partnership with the UK developer Alcemi. In 2025 CIP sold a 50% stake to AXA IM Alts, while CIP led delivery of the project. The battery system was supplied by Canadian Solar's e-STORAGE business, using its SolBank technology, and RES manages the asset day to day. SSE Energy Markets holds a ten-year optimisation agreement for the site, and the project also has a 15-year Capacity Market agreement.
Coalburn 1 is the first phase of the Coalburn site, with a second 500 MW phase, Coalburn 2, expected to follow in 2027. It is one of three transmission-connected battery projects CIP is developing in Scotland, alongside Coalburn 2 and the 500 MW Devilla project near Fife, which together will provide 1.5 GW of power and 3 GWh of storage. By soaking up renewable output that might otherwise be curtailed due to grid constraints, the batteries help reduce wasted generation and support the integration of more wind power onto the GB grid.
Historical Data Available: from 17 Apr 2026 Access Generation Data